Facilities
Capital Projects and Facilities Update
Facilities Work Presentation from the Board Of Education Meeting December 9, 2025
Click here for the Presentation by LAN Associates
Capital Projects
Energy Performance Contract (EPC) Schedule:

|
2024 Capital Projects
|
Status
|
Mamaroneck High School |
|
Masonry restoration and cleaning |
Complete |
Repair the concrete overhead soffit at the stairs to the Palmer boiler room in the Palmer courtyard |
Complete |
Re-coat 2005 addition granular top sheet |
Complete |
Roof Re-coating |
Complete |
Palmer Gymnasium ceiling and floor replacement |
Complete |
Replace Corridor Doors |
Complete |
Palmer galvanized threaded pipe replacement |
Complete |
Hommocks Middle School |
|
Replace skylights in the natatorium |
|
Replace Pool Filter Equipment |
Complete |
Replace Pool Dehumidification units |
|
Replace and relocate the 1967, 3000A MDP adjacent to the loading dock |
|
Reconfigure/ Enlarge Hommocks Cafeteria (Include S108, S109) |
Complete |
Central School |
|
Replace LGI exterior door@ main entrance (4) doors |
|
Replace Main entrance stair adjacent to LGI entrance |
Complete |
New Kitchen |
Complete |
Mamaroneck Avenue School |
|
Masonry repointing, restoration and cleaning |
Complete |
Floor replacement |
Complete |
Interior door replacements |
Complete |
Replacing piping and HVAC equipment |
Complete |
Fire alarm updates |
Complete |
Chatsworth Avenue School |
|
Sky Gym Improvements |
Complete |
Replace wood floors |
Complete |
Replace interior corridor and stair doors |
Complete |
Sanitary pipe repairs and replacement |
Complete |
Replace wiring in fire alarm system |
Complete |
Murray Avenue School |
|
Ramp & lintel repairs and replacement |
|
ADA Ramp Repairs @ Damon Avenue |
|
Recoat EPDM North & South roofs |
|
Replace non-fire rated corridor doors |
|
Replace aging boilers |
|
New Kitchen and Cafeteria Improvements |
Outdoor Learning Spaces Architectural Renderings
Outdoor Learning Space Drawings for Mamaroneck Avenue School
Outdoor Learning Space Drawings for Hommocks Middle School
Facility Use Information
In accordance with Board Policy 1500, the District encourages the cost-effective use of school facilities by school-related groups, community-based organizations, and outside organizations.
- Memorial Turf Field
- All other facilities
-
Identify the facility you want to use
Decide which school space or field you need. Memorial Turf Field has its own forms and fees. Every other facility uses the same set.
-
Read the procedures, rules, and insurance requirements
Memorial Turf Field Regulation 1500-R-MEM (PDF)All other facilities Regulation 1500-R (PDF) -
Estimate the cost
Use the fee schedule for your facility.
Memorial Turf Field Memorial Field fee schedule (1500-F-MEM)All other facilities Fee schedule (1500-F) -
First-time users: complete the first-time application
Only needed if this is your first time and your group is not listed in the policy. Otherwise, skip to Step 5.
Memorial Turf Field First-time user application (E-1-MEM)All other facilities First-time user application (E-1) -
Complete the Facility Use Request Form
Fill out the form for your facility and return it to the school office of the facility you are requesting.
Memorial Turf Field Application for use of Memorial Field (E-2-MEM)All other facilities Application for use of School Facilities (E-2) -
Submit your request for review
Give the completed Facility Use Request Form to the school office of the facility you are requesting. They will do a preliminary review and approval.
Questions about using a district facility? Contact Jenn Guerra in the Facilities Office at (914) 220-3082.
Stormwater Management
Annual reports, compliance forms, newsletters, and fact sheets from the District's stormwater management program. Select a year to see its documents.
2024 Stormwater Management Newsletter, 6 fact sheets, Illicit Discharges
Comments on the Stormwater Management Plan can be sent by email and must be received by February 1, 2026.
Newsletter
Reporting
2023 Stormwater Management Draft annual report and forms, newsletter, 6 fact sheets
Draft annual stormwater reports
Newsletter
2022 Stormwater Management Annual report cover and compliance forms
2021 Stormwater Management Newsletter and 6 fact sheets
Newsletter
2020 Stormwater Management Annual report and forms, newsletter, 6 fact sheets
Annual report and forms
Newsletter
Lead Testing in Drinking Water
Water sampling reports for District schools. Select a card to open the report.
- Initial sampling
- Resampling and additional sampling